4.2 Thermodynamic System and Installation Scheme

4.2.1 The thermodynamic system shall be determined by the temperature and quantity of waste gas,and shall maximize the utilization ratio of waste heat.

4.2.2 Steam parameters of waste heat boiler shall be determined by the waste gas temperature and air flow volume,and parameters of thermodynamic system shall be determined by the factors,such as waste heat condition,turbine internal efficiency,etc..

4.2.3 One steam turbine unit may be used when utilizing waste heat of 2 cement production lines in the same plant.When the steam produced by the waste heat boiler of cement kiln with lower production is less than 30%of rated feed steam of the unit,2 steam turbine units should be used.2 or more steam turbine units should be used when utilizing waste heat of 3 or more cement production lines in the same plant.

主站蜘蛛池模板: 西乌珠穆沁旗| 浦东新区| 伊金霍洛旗| 土默特左旗| 石台县| 琼中| 慈溪市| 云安县| 沽源县| 麻城市| 汉中市| 崇礼县| 丽水市| 湖口县| 股票| 囊谦县| 容城县| 筠连县| 拜泉县| 法库县| 安泽县| 抚州市| 灵川县| 开鲁县| 尉犁县| 二连浩特市| 昆山市| 建湖县| 同仁县| 天水市| 察雅县| 凭祥市| 班戈县| 增城市| 龙海市| 玛沁县| 洪泽县| 儋州市| 临沭县| 洛浦县| 凭祥市|