官术网_书友最值得收藏!

BI project life cycle

Every BI project has its own life cycle. Let us look at a common life cycle:

The first step is Analyze Business requirements, which means that we should gather the business requirements and transform them into functional and non-functional specifications, create a template for reports, and so on. The next step is Design the logical data model, where we build a logical data model based on business requirements, which shows the business entities and the relationships between them. The third step is Design the physical data model, where we transform the logical data model into a physical data model which defines the structure of the data warehouse. The fourth step is Build the data warehouse. In this step, we create the data warehouse, build data marts, and load data.

On the fifth step, Create the Project, we start to work directly in MicroStrategy, where we define schema, attributes, facts, hierarchies and so on. All this information is stored in metadata, the core of MicroStrategy, in a relation database. The sixth step is Develop Reports/Documents and of course dashboards. In addition, we share our insights across the organization using various channels such as email, FTP, and so on.

主站蜘蛛池模板: 永新县| 肇庆市| 西青区| 彰化市| 大关县| 丽水市| 玛沁县| 金寨县| 鹿泉市| 铜鼓县| 博白县| 江油市| 大化| 沭阳县| 平顶山市| 习水县| 新平| 右玉县| 阜南县| 德保县| 潜江市| 龙门县| 三门县| 禄劝| 九台市| 星子县| 宁波市| 辽阳县| 外汇| 田林县| 勃利县| 历史| 宾川县| 平舆县| 拜泉县| 阿图什市| 汉寿县| 台南县| 弋阳县| 福建省| 布拖县|