Iterations and iteration length
Scrum is an iterative, incremental delivery process. Each iteration, or Sprint, as they are known in Scrum, lasts between a minimum of 1 week and a maximum of 4 weeks, with the preference being for as short as possible. Shorter iteration lengths are what give our team its agility, as we get feedback at the end of each iteration; the sooner we get feedback, the faster we can adapt our approach.
If your team is new to working iteratively, there's no denying that it will feel odd at first. Based on experience, my recommendation is that your team picks an iteration length that feels slightly shorter than comfortable. Taking this approach will give your team an opportunity to improve their process so that it fits the iterative style, and challenges them to change up their thinking.
What this means is, if you think 4 weeks is comfortable in which to deliver a working increment, choose 2-week iterations. If you believe that 2 weeks would be more than comfortable, opt for 1-week iterations.
The Scrum team should fix the iteration length, so pick an iteration length and stick to it. If after six iterations it isn't getting easier, then perhaps change the iteration length. Remember, the preference is always for the shortest iteration length possible.
- 物聯網標準化指南
- FreeSWITCH 1.2
- 物聯網智慧安監技術
- 互聯網安全的40個智慧洞見:2015年中國互聯網安全大會文集
- 數字通信同步技術的MATLAB與FPGA實現:Altera/Verilog版(第2版)
- Mastering TypeScript 3
- 面向5G-Advanced的關鍵技術
- 組網技術與網絡管理
- Hands-On Docker for Microservices with Python
- Guide to NoSQL with Azure Cosmos DB
- 現場綜合化網絡運營與維護:運營商數字化轉型技術與實踐
- Intelligent Mobile Projects with TensorFlow
- RestKit for iOS
- 區塊鏈技術與應用:打造分布式商業新生態
- 一本書讀懂移動物聯網