官术网_书友最值得收藏!

Economics, not pricing – Economics

It is important to switch the thinking from what the cost is for assembled technical answers and move to using economic data as an integral part of the solution design process. Today, we go through the design process four or five times, first for assembling a reasonably correct technical answer then pulling it apart in layers, trying to back down to something that is within economic reach yet in a technically desired direction.

If we switch that model and move to looking at designing with economics from the very beginning, we can eliminate nearly all recirculating effort as designs are built then redesigned in the current process. It is also important to keep in mind that much of the technical detail affects implementation details more than it does strategy or economics. If it does not materially affect strategy or dramatically change economics, move on to implementation discussions after confirming a solution strategy and economic direction. If showstoppers rise during implementation conversations, you are still money and time ahead, able to switch directions as needed since you have not done the four or five rounds in traditional processes:

The perfect technical solutions are sometimes unaffordable or miss the strategy. Low-cost solutions may not balance with technical requirements or introduce too much risk. All factors must balance for successful solution design.

主站蜘蛛池模板: 应城市| 临沧市| 炉霍县| 体育| 普格县| 赤壁市| 清远市| 慈溪市| 新竹市| 西吉县| 张家界市| 宜春市| 交城县| 安塞县| 垫江县| 临朐县| 兴和县| 桃江县| 甘南县| 永丰县| 高陵县| 如东县| 博白县| 石屏县| 黄大仙区| 界首市| 上思县| 若羌县| 奈曼旗| 阿城市| 米易县| 吴堡县| 库伦旗| 长岭县| 通渭县| 东宁县| 正蓝旗| 伊吾县| 库车县| 甘泉县| 博罗县|