官术网_书友最值得收藏!

Final requirement

Despite the fact that we're model building right now, we want to build with the future in mind. The future is a production-ready machine learning system that performs linear regression. So whatever functions and methods we write have to take into account other things that may occur in a production environment that may not occur in the model -building phase.

The following are things to consider:

  • Unseen values: We have to write a function that is able to encode previously unseen values.
  • Unseen variables: At some point in the future we might pass a different version of the data in that may contain variables that are unknown at model-building time. We would have to handle that.
  • Different imputation strategies: Different variables will require different strategies for guessing missing data.
主站蜘蛛池模板: 石门县| 河北省| 信宜市| 普安县| 万盛区| 桦南县| 德保县| 福贡县| 社旗县| 汶上县| 塔城市| 鄂伦春自治旗| 奈曼旗| 沁阳市| 宁乡县| 巩留县| 新民市| 保定市| 洛宁县| 承德县| 罗江县| 综艺| 中江县| 辽阳县| 游戏| 什邡市| 丰原市| 济南市| 呼伦贝尔市| 英山县| 福海县| 永吉县| 酒泉市| 普安县| 于田县| 固镇县| 岳普湖县| 肇州县| 荥阳市| 南康市| 香港 |