官术网_书友最值得收藏!

Final requirement

Despite the fact that we're model building right now, we want to build with the future in mind. The future is a production-ready machine learning system that performs linear regression. So whatever functions and methods we write have to take into account other things that may occur in a production environment that may not occur in the model -building phase.

The following are things to consider:

  • Unseen values: We have to write a function that is able to encode previously unseen values.
  • Unseen variables: At some point in the future we might pass a different version of the data in that may contain variables that are unknown at model-building time. We would have to handle that.
  • Different imputation strategies: Different variables will require different strategies for guessing missing data.
主站蜘蛛池模板: 加查县| 巫山县| 鞍山市| 忻州市| 垫江县| 绥中县| 揭阳市| 吴忠市| 临夏市| 明光市| 金川县| 锡林浩特市| 石嘴山市| 新沂市| 九江市| 无棣县| 界首市| 石楼县| 南和县| 丰台区| 黎城县| 保德县| 门头沟区| 哈尔滨市| 屯昌县| 昆明市| 柞水县| 灵台县| 汉源县| 长丰县| 雷州市| 文化| 宁武县| 平顺县| 西安市| 三原县| 佛山市| 集贤县| 武隆县| 林州市| 浦北县|