4.2 Thermodynamic System and Installation Scheme

4.2.1 The thermodynamic system shall be determined by the temperature and quantity of waste gas,and shall maximize the utilization ratio of waste heat.

4.2.2 Steam parameters of waste heat boiler shall be determined by the waste gas temperature and air flow volume,and parameters of thermodynamic system shall be determined by the factors,such as waste heat condition,turbine internal efficiency,etc..

4.2.3 One steam turbine unit may be used when utilizing waste heat of 2 cement production lines in the same plant.When the steam produced by the waste heat boiler of cement kiln with lower production is less than 30%of rated feed steam of the unit,2 steam turbine units should be used.2 or more steam turbine units should be used when utilizing waste heat of 3 or more cement production lines in the same plant.

主站蜘蛛池模板: 孟津县| 兴文县| 略阳县| 通州区| 奎屯市| 临潭县| 洪江市| 娱乐| 平江县| 鸡西市| 建湖县| 隆德县| 舞钢市| 韩城市| 东港市| 墨脱县| 芜湖县| 台东市| 永定县| 武鸣县| 礼泉县| 清水河县| 黄冈市| 阿巴嘎旗| 团风县| 湄潭县| 铜川市| 额济纳旗| 阿荣旗| 合水县| 花莲市| 葵青区| 塔城市| 汉阴县| 浪卡子县| 忻城县| 射洪县| 蓬莱市| 禹城市| 金湖县| 华阴市|