- DL5190.5-2012電力建設施工技術規范第5部分:管道及系統(英文版)
- 中國電力企業聯合會
- 490字
- 2020-09-25 15:34:42
Foreword
This Part is revised from DL 5031-1994 Specification for Thermal Power Erection and Construction-Piping and System according to the requirements of Document GUONENGKEJI[2009]No.163"Notice of National Energy Administration on Formulating(Revising)the First Batch of Professional Standard in the Energy Field in 2009".
DL 5190 Technical Specification for Thermal Power Erection and Construction comprises the following 9 parts:
DL 5190.1 Part 1:Civil Work
DL 5190.2 Part 2:Boiler Unit
DL 5190.3 Part 3:Steam Turbine Generator Units
DL 5190.4 Part 4:Instrumentation and Control
DL 5190.5 Part 5:Piping and System
DL 5190.6 Part 6:Water Treatment and Hydrogen Generation Equipment and System
DL 5190.7 Part 7:Welding
DL 5190.8 Part 8:Processing and Prefabrication
DL 5190.9 Part 9:Hydro-structure
This Part is the fifth part"Piping and System"of DL 5190(hereinafter referred to as"this Part").
The main contents of this Part include general principles,terminology,basic requirments,pipe inspection,installation,testing and cleaning,project documents provided before quality acceptance,annexes,explanation of wording in this Code,list of reference standards,clauses explanation and so on.
In comparison with DL 5031-1994,the main technical changes of this Part are as follows:
—extend the application scope from the pipe installation for primary power unit with 300MW and above capacity to pipes and the system installation of large capacity and high parameter thermal,gasturbine,biomass and waste incineration power plants and conventional islands of nuclear power plants including the pipe and system of the single unit capability of 1000MW.
—add part of the terms and definitions,and redefine some terms.
—add the requirements of factory prefabrication and inspection of high pressure pipes.
—delete the obsoleted clauses regarding the construction of spring compression,supports and hangers components.
—add the pipe construction clauses for T23,P91,P92 and other new materials.
—add the contents of energy-conservation and environment-protection and green construction.
Articles 4.1.4,5.2.2,5.6.15,5.7.9,6.3.6 and 6.3.11 marked in bold fonts of this Part are mandatory provisions,which must be strictly implemented.Mandatory provisions are put under centralized management and interpretation by National Energy Administration.
This Part is proposed by China Electricity Council.
This Part is interpreted by Thermal Power Construction Standardization Technical Committee of Electric Power Industry.
Any comments and suggestions during the execution of this Part:welcomed to feed back to the Standardization Center of China Electricity Council(Address:No.1,Lane 2,Baiguang Road,Beijing,Postcode:100761).
The chief written corporations of this Part:No.1 Engineering Company of Northwest Power Construction and Sichuan No.3 Electric Power Construction Company.
The participants for writting this Part:Anhui No.1 Electric Power Engineering & Construction Company,Henan No.2 Thermal Power Construction Company and Xinjiang Electric Power Research Institute.
The main drafters of this Part:Li Zhongqiu,Yuan Xiaohong,Yang Ru,Wang Wei,Jiang Zhiqi,Lu Kui,Zou Pengju,Liu Guoqing,Li Chungen,Li Jun,Zhao Yongxin and Li Chuanyu.
The main reviewers of this Part:Wang Hongkui,Li Pengqing,Geng Wenfeng,Liu Zhiyuan,Zhou Qigui,Huo Qingyan,Hao Zhigang,Qian Ping,Zhang Qingnian,Dong Zhilian,Yang Xuxian,Zhao Yamin,Wang Shengli,Zhang Shaozhen,Qiao Zhongge,Pei Jiang,Wang Minming,Li Runlin,Rong Gang,Guo Genzhu and Liu Qiang.
Translators of this Part in English edition:Xiao Guohua,Guo Yan,Tian Xiaoxuan,Yang Baixun and Li Yinmin of Xi'an Thermal Power Research Institute Co.,Ltd(TPRI for short).
Reviewers of this Part in English edition:Tian Xiaoqing,Mi Haolin,Cui Wansheng,Su Zuozhen and Du Haoyang.
- GB 51276-2018 煤炭企業總圖運輸設計標準
- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規范(英文版)
- GB 50309-2017 工業爐砌筑工程質量驗收標準
- GB 50222-2017 建筑內部裝修設計防火規范
- 巖土靜力載荷試驗規程
- GB 50084-2017 自動噴水滅火系統設計規范
- GB50580-2010連鑄工程設計規范(英文版)
- 機械基礎地基動力特性測試規程
- DL/T5161.8-2002電氣裝置安裝工程質量檢驗及評定規程第8部分:盤、柜及二次回路接線施工質量檢驗(英文版)
- 巖土工程勘察圖式圖例規程
- GB 51135-2015 轉爐煤氣凈化及回收工程技術規范
- GB 51208-2016 人工制氣廠站設計規范
- GB/T 50398-2018 無縫鋼管工程設計標準
- 中國綠色工業年鑒2020
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程