Foreword
This Part is formulated according to the requirements of Document Guo Neng Ke Ji[2009]No.163 issued by the Professional Technical Committee on Thermal Power Construction of Standardization Administration of China--"Notice on Executing the Development(Revision)Program of Professional Energy Standards for the First Stage in 2009",in association of relevant organizations.
DL 5190"Technical Specification for Thermal Power Erection and Construction"consists of the following 9 parts:
DL 5190.1 Part 1:Civil Work
DL 5190.2 Part 2:Boiler Unit
DL 5190.3 Part 3:Steam Turbine Generator Units
DL 5190.4 Part 4:Instrumentation and Control
DL 5190.5 Part 5:Piping and System
DL 5190.6 Part 6:Water Treatment and Hydrogen Generation Equipment and System
DL 5190.7 Part 7:Welding
DL 5190.8 Part 8:Processing Preparation
DL 5190.9 Part 9:Hydro-structure
This Part is the eighth part"Processing Preparation"((hereinafter referred to as"this Part")of DL/T 5190.
The main contents of this Part include:General Provisionos,Basic Requirements,Material Inspection and Storage,Air&Flue Gas Ducts/Raw Coal&Pulverized Coal Piping and Parts,Steam/Water Pipelines and Parts,Steel Welding Atmospheric Vessels,Metal Components,Other,Project Documents to be Provided Before Quality Acceptance and List of Reference Standards.In this Part,Articles 7.3.5,7.3.6,7.3.7 and 7.3.8 printed in bold type are compulsory provisions and must be enforced strictly.
This Part was proposed by the China Electricity Council.
This Part is under the jurisdiction of the Professional Technical Committee on Thermal Power Construction of Standardization Administration of China.
Chief Development Organizations:
Anhwei Electric Power Construction No.1 Company and Hebei No.2 Electric Power
Construction Company
Participating Development Organization:
Sichuan No.3 Electric Power Construction Company
Chief Drafting Staff:
Liang Binghai Li Chuanyu Yang Liancun Zhang Xiaodong Yang Baojian
Bai Yonggang Lan Hua Mao Xudong Li Shuangguo Shi Guangqin
Chief Examiners:
Huo Li Zhou Defu Yang Hangge Jin Xudong Shi Yucheng Shao Zhifan
Zhang Ping Xue Zhiqiang Wang Hongdong Zhao Jun Han Qihua
Dong Huashan Qian Haiping Xu Zhigang Feng Zhongpei Gu Xiangqi
Wan Wei Li Yunhao Liu Shougui Li Weimin Yang Hejun.
During the process of implementing this Part,relevant opinions and advices,whenever necessary,can be fed back to the China Electricity Council Standardization Center(Address:No.1,Baiguang Road Ertiao,Beijing,100761,China).
- 鋼鐵企業原料場工程設計標準
- GB 50260-2013 電力設施抗震設計規范(英文版)
- 設計系統發展研究
- GB 51326-2018 鈦冶煉廠工藝設計標準
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規范(英文版)
- GB/T 51132-2015 工業有色金屬管道工程施工及質量驗收規范
- 汽車故障診斷技巧與禁忌速查手冊
- GB 51156-2015 液化天然氣接收站工程設計規范
- 工業文化研究(第2輯):紀念改革開放四十年——中國工業的大轉型
- GB/T 51223-2017 公共建筑標識系統技術規范
- GB50830-2013冶金礦山采礦設計規范(英文版)
- GB 51236-2017 民用機場航站樓設計防火規范
- GB 51247-2018 水工建筑物抗震設計標準
- DL/T 5366-2014 發電廠汽水管道應力計算技術規程
- 棉紡織工廠設計標準