- GB50607-2010高爐噴吹煤粉工程設計規范(英文版)
- 中國冶金建設協會
- 452字
- 2020-09-25 15:32:30
Foreword
This Standard was jointly developed by Capital Engineering & Research Incorporation Limited(CERI)and other relevant units according to the requirements of Document Jian Biao〔2007〕No.126 issued by the original Ministry of Construction(MOC)-Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2007(2nd batch).
During the development of this Standard,the development group conducted extensive researches and technical studies on specific topics,summed up years of practices and experiences of designing pulverized coal injection(PCI),and solicited opinions from various units and organizations such as manufacturers,research institutes,design institutes and institutions of higher education,and finalized the draft through serious review.
This Standard comprises 8 chapters with the main technical contents as follows:General provisions,Terms,Process and Equipment,Oxygen-enriched blast and oxygen supply pipeline,Building and structure,Electrical and instrumentation control,Energy media,as well as Fire protection,security and environmental protection.
The provisions printed in bold type are compulsory ones and must be enforced strictly.
Ministry of Housing and Urban-Rural Development(MOHURD)is in charge of the administration of this Standard and the explanation of the compulsory provisions,while China Metallurgical Construction Association in charge of the routine management,and CERI in charge of the explanation of specific technical contents.All relevant organizations are kindly requested to sum up and accumulate experiences in actual project practices during the process of implementing this Standard.If somewhere in this Standard needs to be modified or supplemented,please send your comments and suggestions to the Management Unit of Design Regulations of Pulverized Coal Injection for Blast Furnace of CERI(Address:No.7 Jiananjie,Beijing Economic-Technological Development Area,Beijing;Zip code:100176)to provide reference for future revision.
Chief Development Organization,Participating Development Organizations,Chief Drafting Staff and Main Reviewers of this code are listed below.
Chief Development Organization:
Capital Engineering & Research Incorporation Limited
Participating Development Organizations:
CISDI Engineering Co.,Ltd.
WISDRI Engineering & Research Incorporation Ltd.
Huatian Engineering & Technology Corporation
Beris Engineering & Research Corporation
Beijing Shougang International Engineering Technology Co.,Ltd.
Baoshan Iron & Steel Co.,Ltd.
Anshan Iron & Steel Group Corporation
Wuhan Iron & Steel Group Corporation
Chief Drafting Staff:
Wu Qichang Zhang Jianliang Jia Jing Wang Yanmin Hu Rijun
Liu Ying Tang Zhenyan Tang Qinghua Zhu Jinming Yao Bo
Tang Chuxiong Han Zhongli Zhou Shuyuan Wang Weihai Yan Xin
Xi Banghua
Chief Reviewers:
Gu Fei Peng Huaguo Tang Wenquan Zhou Jiangang Yu Jincheng
Wan Chenglue He Guoqiang Zhao Jun Wang Lin Wu Qiuting
- 架空輸電線路荷載規范
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- GB 51180-2016 煤礦采空區建(構)筑物地基處理技術規范
- GB 51287-2018 煤炭工業露天礦土地復墾工程設計標準
- 電磁式流量傳感器測量方法及理論
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB/T 50770-2013 石油化工安全儀表系統設計規范(英文版)
- GB50580-2010連鑄工程設計規范(英文版)
- GB 51156-2015 液化天然氣接收站工程設計規范
- 海上架空輸電線路設計技術規程
- DL/T5233-2010±800kV及以下直流換流站電氣裝置施工質量檢驗及評定規程(英文版)
- DL 5068-2014 發電廠化學設計規范
- GB 50311-2016 綜合布線系統工程設計規范
- DL/T 5028.3-2015 電力工程制圖標準 第3部分:電氣、儀表與控制部分
- GB/T 50417-2017 煤礦井下供配電設計規范