3 Reheating Furnace
3.1 General
3.1.1 The chapter applies to design of furnaces in the large and medium sized mill and forge shop either built newly or in continuous production.
3.1.2 The type of furnace and the level of technology and equipment shall match with the production scale of workshop and the level of rolling process equipment.The selected structure,material and equipment of furnace shall meet the requirements of transportation,construction and installation,maintenance and replacement.
3.1.3 Configuration of number of furnaces and capacity of each furnace shall be based on improving furnace efficiency;standby furnace for maintenance in turn shall be spared.But capacity for further play of rolling mill capacity shall be reserved.
3.1.4 Designed nominal specific consumption of newly-built reheating furnace fired by gas or oil shall reach the"advanced index"in Table 3.1.4;designed nominal specific consumption of gas fired or oil fired reheating furnace modified or expanded,shall reach the"average advanced index"in Table 3.1.4.
Table 3.1.4 Designed nominal specific consumption of reheating furnace

Notes:1 The nominal specific consumption in this table is the specific fuel consumption under the conditions that,reference structural carbon steel billet/slab is cold charged and heated to the set discharging temperature,insulation layer of the water-cooled(evaporated cooling)units in furnace is good,and specific fuel consumption of reheating furnace reaches that under nominal production.
2 The nominal specific consumption in this table is applicable to walking beam type reheating furnace and pusher type reheating furnace which are listed in the Table 3.2.3 in this Code.
3.1.5 The cooling system of water pipes in furnace shall adopt evaporated cooling,and the generated steam should be connected to the power pipeline network of the factory for running together.
3.1.6 The highest temperature for design calculation of outer surface of the furnace bricking-up shall be in accordcance with the relevant provisions of current national standard"General principles for thermal insulation technique of industrial furnaces"GB/T 16618.
3.1.7 The waste heat in billet/slab of the last procedure shall be taken full advantage of during overall design procedure.
3.1.8 On the furnace layout drawing,related structures and equipment names,location dimensions and the location of various energy medium's T.O.P.in the furnace area shall be marked.
- GB50526-2010公共廣播系統工程技術規范(英文版)
- 配用電通信技術及產業發展報告
- GB 51137-2015 電子工業廢水廢氣處理工程施工及驗收規范
- DL/T 5512-2016 火力發電廠熱工檢測及儀表設計規程
- GB 50469-2016 橡膠工廠環境保護設計規范
- GB51105-2015擠壓鋼管工程設備安裝與驗收規范(英文版)
- DL/T 5160-2015 電力工程巖土描述技術規程
- DL/T5233-2010±800kV及以下直流換流站電氣裝置施工質量檢驗及評定規程(英文版)
- 電力系統無功補償及調壓設計技術導則
- GB 50825-2013 鋼鐵廠加熱爐工程質量驗收規范 (英文版)
- GB 50588-2017 水泥工廠余熱發電設計標準
- DL/T 5501-2015 凍土地區架空輸電線路基礎設計技術規程
- GB50475-2008石油化工全廠性倉庫及堆場設計規范(英文版)
- 火力發電企業繼電保護技術監督手冊
- YS/T 5425-2014 有色金屬加工設備安裝工程質量檢驗評定標準