官术网_书友最值得收藏!

4.4 Installation of Sampling Element and Sensitive Element

4.4.1 Quantity for acceptance inspection.

1 The sampling elements and sensitive elements exposed to high-temperature,high-pressure,negative-pressure,combustible,explosive,toxic and harmful media shall be inspected by 100%.

2 The sampling elements and sensitive elements exposed to middle-and lower pressure,normaltemperature innoxious media shall be randomly inspected by 30% according to the type of the sampling element and sensitive element.

3 100 % alloy steel material spectrum shall be re-inspected and recorded.

4.4.2 Installation of temperature measuring element.

1 Installation,inspection and acceptance of steam,water,oil pipe temperature measuring elements are detailed in Table 4.4.2-1.

Table 4.4.2-1 Installation of steam,water,oil pipe temperature measuring elements

img

Table 4.4.2-1(Continued)

img

2 Installation inspection and acceptance of sheathed thermocouple for non-fixing device for measuring metal wall temperature are detailed in Table 4.4.2-2.

Table 4.4.2-2 Installation of sheathed thermocouple for non-fixing device for measuring metal wall temperature

img

3 Installation inspection and acceptance of sheathed thermocouple for staple sleeve device for measuring metal wall temperature are detailed in Table 4.4.2-3.

Table 4.4.2-3 Installation of sheathed thermocouple for staple sleeve device for measuring metal wall temperature

img

4 Installation inspection and acceptance of special thermal resistance for measuring metal wall temperature are detailed in Table 4.4.2-4.

Table 4.4.2-4 Installation of special thermal resistance for measuring metal wall temperature

img

5 Installation inspection and acceptance of temperature measuring elements for fume,air,pulverized coal pipe and equipment are detailed in Table 4.2.2-5.

Table 4.4.2-5 Installation of temperature measuring elements for fume,air,pulverized coal pipe and equipment

img

4.4.3 Installation of pressure sampling element.

1 See Table 4.4.3-1 for installation inspection and acceptance of steam,water and oil pipe pressure sampling element.

Table 4.4.3-1 Installation of steam,water and oil pipe pressure sampling element

img

2 Installation inspection and acceptance of pressure sampling element for fume,air and pulverized coal pipes are detailed in Table 4.4.3-2.

Table 4.4.3-2 Installation of pressure sampling element for fume,air and pulverized coal pipes

img

4.4.4 Installation of flow sensing element and instrumentation equipment.

1 Installation inspection and acceptance of nozzle and standard orifice plate are detailed in Table 4.4.4-1.

Table 4.4.4-1 Installation of nozzle and standard orifice plate

img

Table 4.4.4-1(Continued)

img

2 Installation inspection and acceptance of assemble-type long-neck nozzle are detailed in Table 4.4.4-2.

Table 4.4.4-2 Installation of assemble-type long-neck nozzle

img

3 Installation inspection and acceptance of annubar flowmeter are detailed in Table 4.4.4.3.

Table 4.4.4-3 Installation of annubar flowmeter

img

4 Installation inspection and acceptance of wing speed measurement pipe are detailed in Table 4.4.4-4.

Table 4.4.4-4 Installation of wing speed measurement pipe

img

5 Installation inspection and acceptance of rotameter are detailed in Table 4.4.4-5.

Table 4.4.4-5 Installation of rotameter

img

6 Installation inspection and acceptance of oval gear flowmeter are detailed in Table 4.4.4-6.

Table 4.4.4-6 Installation of oval gear flowmeter

img

7 Installation inspection and acceptance of target type flowmeter are detailed in Table 4.4.4-7.

Table 4.4.4-7 Installation of target type flowmeter

img

8 Installation inspection and acceptance of turbine flowmeter are detailed in Table 4.4.4-8.

Table 4.4.4-8 Installation of turbine flowmeter

img

9 Installation inspection and acceptance of vortex(vortex street)flowmeter are detailed in Table 4.4.4-9.

Table 4.4.4-9 Installation of vortex(vortex street)flowmeter

img

10 Installation inspection and acceptance of electromagnetic flowmeter are detailed in Table 4.4.4-10.

Table 4.4.4-10 Installation of electromagnetic flowmeter

img

11 Installation inspection and acceptance of ultrasonic flowmeter are detailed in Table 4.4.4-11.

Table 4.4.4-11 Installation of ultrasonic flowmeter

img

4.4.5 Installation of level sensing element and instrumentation equipment.

1 Installation inspection and acceptance of differential pressure type sampling element for liquidlevel measurement are detailed in Table 4.4.5-1.

Table 4.4.5-1 Installation of differential pressure type sampling element for liquid-level measurement

img

Table 4.4.5-1(Continued)

img

2 Installation inspection and acceptance of electrical contact water level gauge are detailed in Table 4.4.5-2.

Table 4.4.5-2 Installation of electrical contact water level gauge

img

3 Installation inspection and acceptance of float ball level meter are detailed in Table 4.4.5-3.

Table 4.4.5-3 Installation of float ball level meter

img

4 Installation inspection and acceptance of float-cylinder level meter are detailed in Table 4.4.5-4.

Table 4.4.5-4 Installation of float-cylinder level meter

img

5 Installation inspection and acceptance of capacitance level meter are detailed in Table 4.4.5-5.

Table 4.4.5-5 Installation of capacitance level meter

img

6 Installation inspection and acceptance of ultrasonic(radar)level meter are detailed in Table 4.4.5-6.

Table 4.4.5-6 Installation of ultrasonic(radar)level meter

img

4.4.6 Installation of analytical sampling device.

1 Installation inspection and acceptance of zirconia oxygen-content analytical sampling device are detailed in Table 4.4.6-1.

Table 4.4.6-1 Installation of zirconia oxygen-content analytical sampling device

img

2 Installation inspection and acceptance of steam-water analytical sampling device are detailed in Table 4.4.6-2.

Table 4.4.6-2 Installation of steam-water analytical sampling device

img

3 Installation inspection and acceptance of gas analytical sampling device are detailed in Table 4.4.6-3.

Table 4.4.6-3 Installation of gas analytical sampling device

img

4 Installation inspection and acceptance of furnace tube leak probe are detailed in Table 4.4.6-4.

Table 4.4.6-4 Installation of furnace tube leak probe

img

5 Installation inspection and acceptance of fly ash carbon content measuring device are detailed in Table 4.4.6-5.

Table 4.4.6-5 Installation of fly ash carbon content measuring device

img

4.4.7 Installation of special instrument.

1 Installation inspection and acceptance of induced displacement measuring device are detailed in Table 4.4.7-1.

Table 4.4.7-1 Installation of induced displacement measuring device

img

2 Installation inspection and acceptance of electromagnetic vibration measuring device are detailed in Table 4.4.7-2.

Table 4.4.7-2 Installation of electromagnetic vibration measuring device

img

3 Installation inspection and acceptance of current vortex measuring device are detailed in Table 4.4.7-3.

Table 4.4.7-3 Installation of current vortex measuring device

img

4 Installation inspection and acceptance of magnetoelectric speed sensor are detailed in Table 4.4.7-4.

Table 4.4.7-4 Installation of magnetoelectric speed sensor

img

5 Installation inspection and acceptance of travel indicator measuring device are detailed in Table 4.4.7-5.

Table 4.4.7-5 Installation of travel indicator measuring device

img

4.4.8 Installation of material weighing sensor.

1 Installation inspection and acceptance of electronic belt weigher are detailed in Table 4.4.8-1.

Table 4.4.8-1 Installation of electronic belt weigher

img

2 Installation inspection and acceptance of weigh bridge are detailed in Table 4.4.8-2.

Table 4.4.8-2 Installation of weigh bridge

img

4.4.9 Installation of monitoring and sensing element.

1 Installation inspection and acceptance of furnace flame camera are detailed in Table 4.4.9-1.

Table 4.4.9-1 Installation of furnace flame camera

img

2 Installation inspection and acceptance of water level camera are detailed in Table 4.4.9-2.

Table 4.4.9-2 Installation of water level camera

img

3 Installation inspection and acceptance of flame detection and monitoring probe are detailed in Table 4.4.9-3.

Table 4.4.9-3 Installation of flame detection and monitoring probe

img

Table 4.4.9-3(Continued)

img

4 Installation inspection and acceptance of camera are detailed in Table 4.4.9-4.

Table 4.4.9-4 Installation of camera

img
主站蜘蛛池模板: 云林县| 盐亭县| 苏尼特右旗| 兴安县| 囊谦县| 米林县| 岐山县| 遂宁市| 乌苏市| 揭阳市| 青岛市| 芮城县| 托里县| 贵溪市| 扎鲁特旗| 宜宾市| 洛阳市| 黔东| 安顺市| 柳江县| 弥渡县| 常山县| 普定县| 南澳县| 湾仔区| 额济纳旗| 孝昌县| 桃园市| 体育| 大庆市| 石台县| 深圳市| 武汉市| 巴中市| 镇原县| 永济市| 扬州市| 柳林县| 沂源县| 金山区| 淮安市|