3.3 Voltage Measurement and Insulation Monitoring
3.3.1 The AC voltage shall be measured for the following circuits:
1 Stator circuits of synchronous generators and generators/motors.
2 Main AC busbars at various voltage levels
3 Tie lines of the electric power system(at line side)
4 Other circuits that are equipped with VTs.
3.3.2 The AC voltage shall be measured and recorded for the voltage quality monitoring points in the electric power system and the voltage busbars of steam turbine-generators with a capacity of 50MW and above.
3.3.3 For 110kV and above main busbar and transformer circuits with neutral being solidly grounded,three phase-to-phase voltages shall be measured.In contrast,for 66kV and below main busbar and transformer circuits,only one phase-to-phase voltage shall be measured.In case of the main busbar and transformer circuits where a single voltage transformer is wired,only single-phase voltage or one phase-tophase voltage may be measured for the transformer circuit.
3.3.4 The insulation shall be monitored for the following AC systems:
1 Stator circuits of synchronous generators and generator/motors.
2 Busbars and circuits without neutral being effectively grounded.
3.3.5 For main busbar whose neutral is not effectively grounded,one phase-to-phase voltage of the busbar should be measured and three phase voltages should be monitored for the insulation.
3.3.6 The insulation of the stator circuits of generators may be monitored through measuring the zerosequence voltage of the auxiliary secondary winding of the generator voltage transformers or through measuring the three phase voltages of the generators.
3.3.7 The DC voltage shall be measured for the following circuits:
1 Excitation circuits of synchronous generators and generator/motors and output circuits of the associated automatic and manual excitation adjustment system.
2 Excitation circuits of synchronous generators.
3 DC generator circuits
4 Main busbars of DC system,and DC output circuits of battery packs and charging and float charging rectifying devices.
5 Output circuits of major power rectifying devices.
3.3.8 The insulation shall be monitored for the following DC system circuit:
1 Excitation circuits of synchronous generators and generators/motors.
2 Excitation circuits of synchronous motors.
3 Main busbars of DC system and major DC circuits.
4 Output circuits of major power rectifying devices.
3.3.9 The DC system shall be equipped with insulation monitoring devices which directly measure insulation resistance values with an accuracy class of not lower than class 1.5.
- DL/T 5044-2014 電力工程直流電源系統設計技術規程
- GB/T 50381-2018 城市軌道交通自動售檢票系統工程質量驗收標準
- GB 50077-2017 鋼筋混凝土筒倉設計標準
- 真空電子器件生產線設備安裝技術標準
- 電磁式流量傳感器測量方法及理論
- GB 51214-2017 煤炭工業露天礦邊坡工程監測規范
- SH/T3143-2012石油化工往復壓縮機工程技術規范(英文版)
- GB 51205-2016 精對苯二甲酸工廠設計規范
- DL/T 866-2015 電流互感器和電壓互感器選擇及計算規程
- GB/T 51218-2017 機械工業工程設計基本術語標準
- DL/T5233-2010±800kV及以下直流換流站電氣裝置施工質量檢驗及評定規程(英文版)
- GB 51171-2016 通信線路工程驗收規范
- GB 51151-2016 城市軌道交通公共安全防范系統工程技術規范
- 鋼鐵渣處理與綜合利用技術標準
- GB 50295-2016 水泥工廠設計規范