3 Hydrologic Survey
3.1 General Requirements
3.1.1 Field hydrologic survey shall be conducted before other engineering hydrology works for nuclear power plant,no matter whether measured hydrologic data for the site is available or not.
3.1.2 The objectives,requirements,scope and content of survey shall be determined beforehand according to the engineering task.A list of data to be collected and content of survey shall be developed.
3.1.3 Reconnaissance surveys,interviews,necessary tests and data collection from local water conservancy,oceanic,planning,environmental protection,transport and other authorities shall be conducted to identify the variation characteristics of hydrologic elements.
3.1.4 The major survey content includes investigations on flood,source of fresh water,scour and silting of river banks,seashore,riverbed and seabed,landslide,collapse,debris flow,tide,wave,sea current,sediment,water temperature,storm surge,seiche,tsunami,rainstorm,ice condition,snow and other conditions that may affect the project.
3.1.5 The land flood survey and low-water survey shall cover vertical sections,cross sections,flood(lowwater)mark elevations,current water level,talweg or longitudinal slope of the main channel in the entire river reach to be surveyed.The survey points shall be such arranged that changes in water level and river sections can be revealed.
The sea survey shall cover high(low)tidal level marks,current tidal level and elevations of varied points along the shoreline.The scope of survey shall cover the entire sea area under consideration.
3.1.6 Reconnaissance survey results shall be completely recorded.Survey data shall be sorted out,analyzed,and verified on site,and corrected in the case of any problem.A report or an instruction shall be compiled after the survey.
- GB/T50796-2012 光伏發(fā)電工程驗(yàn)收規(guī)范(英文版)
- GB/T 51338-2018 分布式電源并網(wǎng)工程調(diào)試與驗(yàn)收標(biāo)準(zhǔn)
- GB 51145-2015 煤礦電氣設(shè)備安裝工程施工與驗(yàn)收規(guī)范
- GB 51134-2015 煤礦瓦斯發(fā)電工程設(shè)計(jì)規(guī)范
- GB50764-2012電廠動(dòng)力管道設(shè)計(jì)規(guī)范(英文版)
- GB/T 50938-2013 石油化工鋼制低溫儲(chǔ)罐技術(shù)規(guī)范(英文版)
- GB 51333-2018 厚膜陶瓷基板生產(chǎn)工廠設(shè)計(jì)標(biāo)準(zhǔn)
- SH/T3143-2012石油化工往復(fù)壓縮機(jī)工程技術(shù)規(guī)范(英文版)
- GB 51205-2016 精對(duì)苯二甲酸工廠設(shè)計(jì)規(guī)范
- 鐵路罐車清洗設(shè)施設(shè)計(jì)標(biāo)準(zhǔn)
- DL/T 866-2015 電流互感器和電壓互感器選擇及計(jì)算規(guī)程
- DL/T 5516-2016 火力發(fā)電廠集中控制室及電子設(shè)備間布置設(shè)計(jì)規(guī)程
- 建設(shè)工程化學(xué)灌漿材料應(yīng)用技術(shù)標(biāo)準(zhǔn)
- 發(fā)光二極管生產(chǎn)工藝設(shè)備安裝工程施工及質(zhì)量驗(yàn)收標(biāo)準(zhǔn)
- VRP11虛擬現(xiàn)實(shí)編輯器標(biāo)準(zhǔn)教程