Foreword
This code is prepared by Electric Power Planning & Engineering Institute in collaboration with associated organizations as required by the Notice on Development and Revision Plan of National Standards for Engineering Construction in 2007(the second batch) issued by the former Ministry of Construction(JB[2007] 126).
This code has been developed through multiple special studies,investigation and sum-up of engineering hydrology-related experience and lessons from domestic and foreign nuclear power plants,adoption of recent scientific results of engineering hydrology for nuclear power plants,extensive consultations from competent authorities in charge of design,survey,scientific research as well as water resources and ocean across the country and a number of discussions and revisions,and finalized after review.
This code is organized into 9 chapters,mainly including General,Terms,Hydrologic Survey,Design Basis Flood,Design Basis Low Water Level,Water Source,Sediment and Beach Stability,Hydrologic Observation and Representative Station,as well as Contents and Requirements at Each Engineering Stage of Nuclear Power Plant Engineering.
This code isadministrated by the Ministry of Housing and Urban-Rural Development of the People's Republic of China.China Electricity Council is responsible for its daily management,and Electric Power Planning & Engineering Institute is responsible for the interpretation of specific technical issues therein.During the implementation of this code,the interests concerned are expected to seriously summarize experience and collect relevant information based on the project practices and refer any comments and suggestions to Electric Power Planning & Engineering Institute at the address:No.65,Ande Road,Xicheng District,Beijing,Postcode:100120,for reference in the future revision of the code.
Chief drafting organizations,participants,leading authors and main reviewers of this code:
Chief drafting organization:
Electric Power Planning & Engineering Institute
Participants:
East China Electric Power Design Institute of China Power Engineering Consulting Group
Guangdong Electric Power Design Institute
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
North China Power Engineering Co.,Ltd.of China Power Engineering Consulting Group
Southwest China Electric Power Design Institute of China Power Engineering Consulting
Group
Shandong Electric Power Engineering Consulting Institute Corp.,Ltd.of State Nuclear
Power Technology Corporation
China Nuclear Power Engineering Co.,Ltd.
Leading authors:
Zhu Jingxing Dai Youxin Yao Peng Qin Xuelin Liang Shuilin Lu Xiaodong
Hu Changquan Jin Minghong Lv Zhifeng Lian Jie Ou Zichun Li Shun
Wang Qifeng Gu Hongqin Su Yiquan Song Jianjun
Main reviewers:
Wang Xinian Huang Bensheng Zhang Ailing Wang Jianguo Qi Bingqiang
Li Wuquan Zhao Xuemin Xu Gaohong Miao Yanhong Tang Liqun
Liao Kangming Li Weilin Rao Zhenxiang
- DL/T 5390-2014 發(fā)電廠和變電站照明設(shè)計技術(shù)規(guī)定
- GB/T50796-2012 光伏發(fā)電工程驗收規(guī)范(英文版)
- 加油站在役油罐防滲漏改造工程技術(shù)標準
- 電動汽車工程手冊(第六卷):智能網(wǎng)聯(lián)
- GB 50349-2015 氣田集輸設(shè)計規(guī)范
- GB/T 51183-2016 農(nóng)業(yè)溫室結(jié)構(gòu)荷載規(guī)范
- GB 50469-2016 橡膠工廠環(huán)境保護設(shè)計規(guī)范
- GB/T 51132-2015 工業(yè)有色金屬管道工程施工及質(zhì)量驗收規(guī)范
- GB 51333-2018 厚膜陶瓷基板生產(chǎn)工廠設(shè)計標準
- GB 51205-2016 精對苯二甲酸工廠設(shè)計規(guī)范
- DL/T5231-2010±800kV及以下直流輸電接地極施工及驗收規(guī)程(英文版)
- GB/T 51200-2016 高壓直流換流站設(shè)計規(guī)范
- 鄭州軌道交通安裝工藝運營需求標準
- 鉆探、井探、槽探操作規(guī)程
- DL 5068-2014 發(fā)電廠化學設(shè)計規(guī)范