官术网_书友最值得收藏!

Foreword

This code is prepared by Electric Power Planning & Engineering Institute in collaboration with associated organizations as required by the Notice on Development and Revision Plan of National Standards for Engineering Construction in 2007(the second batch) issued by the former Ministry of Construction(JB[2007] 126).

This code has been developed through multiple special studies,investigation and sum-up of engineering hydrology-related experience and lessons from domestic and foreign nuclear power plants,adoption of recent scientific results of engineering hydrology for nuclear power plants,extensive consultations from competent authorities in charge of design,survey,scientific research as well as water resources and ocean across the country and a number of discussions and revisions,and finalized after review.

This code is organized into 9 chapters,mainly including General,Terms,Hydrologic Survey,Design Basis Flood,Design Basis Low Water Level,Water Source,Sediment and Beach Stability,Hydrologic Observation and Representative Station,as well as Contents and Requirements at Each Engineering Stage of Nuclear Power Plant Engineering.

This code isadministrated by the Ministry of Housing and Urban-Rural Development of the People's Republic of China.China Electricity Council is responsible for its daily management,and Electric Power Planning & Engineering Institute is responsible for the interpretation of specific technical issues therein.During the implementation of this code,the interests concerned are expected to seriously summarize experience and collect relevant information based on the project practices and refer any comments and suggestions to Electric Power Planning & Engineering Institute at the address:No.65,Ande Road,Xicheng District,Beijing,Postcode:100120,for reference in the future revision of the code.

Chief drafting organizations,participants,leading authors and main reviewers of this code:

Chief drafting organization:

Electric Power Planning & Engineering Institute

Participants:

East China Electric Power Design Institute of China Power Engineering Consulting Group

Guangdong Electric Power Design Institute

Northeast Electric Power Design Institute of China Power Engineering Consulting Group

North China Power Engineering Co.,Ltd.of China Power Engineering Consulting Group

Southwest China Electric Power Design Institute of China Power Engineering Consulting

Group

Shandong Electric Power Engineering Consulting Institute Corp.,Ltd.of State Nuclear

Power Technology Corporation

China Nuclear Power Engineering Co.,Ltd.

Leading authors:

Zhu Jingxing Dai Youxin Yao Peng Qin Xuelin Liang Shuilin Lu Xiaodong

Hu Changquan Jin Minghong Lv Zhifeng Lian Jie Ou Zichun Li Shun

Wang Qifeng Gu Hongqin Su Yiquan Song Jianjun

Main reviewers:

Wang Xinian Huang Bensheng Zhang Ailing Wang Jianguo Qi Bingqiang

Li Wuquan Zhao Xuemin Xu Gaohong Miao Yanhong Tang Liqun

Liao Kangming Li Weilin Rao Zhenxiang

主站蜘蛛池模板: 三明市| 凤冈县| 古浪县| 将乐县| 巫山县| 临颍县| 三穗县| 江孜县| 多伦县| 南陵县| 沁源县| 抚州市| 奎屯市| 新郑市| 西峡县| 介休市| 南和县| 万宁市| 尼木县| 萝北县| 大城县| 神池县| 福海县| 彩票| 阿克| 双牌县| 渝中区| 乐至县| 公主岭市| 南陵县| 策勒县| 黑河市| 宜都市| 临夏市| 柘城县| 泸州市| 乌兰县| 玉山县| 应城市| 绥阳县| 金川县|