4.5 Seiche Set-up

4.5.1 Where the plant is located on the bank of an enclosed or partially enclosed water body,the possibility of seiche occurrence shall be evaluated.

4.5.2 Where long-term measured tidal level and other related data is available for the plant site,the maximum possible seiche can be determined using the probabilistic and deterministic method with their results cross validated.

4.5.3 The seiche set-up shall be calculated in the steps given below:select several typical seiche processes,analyze the environmental background of each individual seiche,determine the external driving force for each seiche and check the reliability of the numerical model.The main parameters for evaluating a seiche include amplitude,cycle,cause,frequency,and seasonal variation.

4.5.4 The numerical model shall be used to simulate historical possible seiche in the environmental background on an annual basis,and obtain the annual series of seiche extremes to extrapolate the seiche that has a multiple-year return period.The force parameters that may cause the most significant seiche at the site shall be chosen to calculate the maximum possible set-up.The results shall be compared and analyzed to determine the maximum possible seiche set-up in a reasonable manner.

主站蜘蛛池模板: 高安市| 南涧| 紫金县| 山阴县| 商丘市| 德州市| 颍上县| 个旧市| 麦盖提县| 唐山市| 读书| 南昌县| 正定县| 桃园市| 贞丰县| 营山县| 安义县| 温泉县| 名山县| 宁晋县| 达州市| 枣强县| 龙门县| 肥乡县| 四子王旗| 墨竹工卡县| 台北市| 怀宁县| 武威市| 财经| 响水县| 新邵县| 黎平县| 遂宁市| 酉阳| 宿松县| 大庆市| 莲花县| 五原县| 肇东市| 阿城市|