4.5 Seiche Set-up

4.5.1 Where the plant is located on the bank of an enclosed or partially enclosed water body,the possibility of seiche occurrence shall be evaluated.

4.5.2 Where long-term measured tidal level and other related data is available for the plant site,the maximum possible seiche can be determined using the probabilistic and deterministic method with their results cross validated.

4.5.3 The seiche set-up shall be calculated in the steps given below:select several typical seiche processes,analyze the environmental background of each individual seiche,determine the external driving force for each seiche and check the reliability of the numerical model.The main parameters for evaluating a seiche include amplitude,cycle,cause,frequency,and seasonal variation.

4.5.4 The numerical model shall be used to simulate historical possible seiche in the environmental background on an annual basis,and obtain the annual series of seiche extremes to extrapolate the seiche that has a multiple-year return period.The force parameters that may cause the most significant seiche at the site shall be chosen to calculate the maximum possible set-up.The results shall be compared and analyzed to determine the maximum possible seiche set-up in a reasonable manner.

主站蜘蛛池模板: 沅陵县| 渝中区| 江孜县| 花莲市| 天等县| 盱眙县| 兴隆县| 同德县| 洪洞县| 任丘市| 建宁县| 两当县| 闵行区| 云阳县| 陵水| 分宜县| 苍梧县| 锡林浩特市| 库伦旗| 乐陵市| 九江县| 广安市| 凤冈县| 博湖县| 长治市| 平顺县| 东乌| 独山县| 西安市| 甘肃省| 比如县| 台山市| 永德县| 楚雄市| 友谊县| 河曲县| 扎鲁特旗| 新蔡县| 尤溪县| 青龙| 马鞍山市|