官术网_书友最值得收藏!

Foreword

This code is prepared by the requirement of Announcement of printing and distribution of establishment and revision plans for national standards in engineering construction in 2001 to 2002(Jian Biao[2002]No.85)of Ministry of Construction of the People's Republic of China.This code is revised on the basis of GB 50168-92 Electric Equipment Installation Engineering Code for Construction and Acceptance of cable System by China Electric Power Research Institute and the relevant departments.

This code comprises 8 chapters and 1 appendixes with the main contents as follows:General provisions,Terms,Transportation,storage and keeping of cables and accessories,Construction of attached facilities and structures of power cable line,Laying of cables,Installation of cable accessories,Construction of the fireproofing and flame-retardant facilities in power cable line,Transfer and acceptance.

As compared with the former edition,the following revisions are made herein:

1.The chapter"Terms"is additionally incorporated.

2.The more explicit provisions in connection of cable duct are given.

3.The more strict and specific provisions in cable fireproof construction are given.

4.The provisions in construction of cable dividing box are additionally incorporated.

5.The more strict and specific provisions in construction of overhead cable line are given.

6.In the chapter of"installation of the cable accessories",the specific provisions in installation of termination and joint of high voltage cable are given.

The provisions printed in bold type in this code are compulsory ones and must be enforced strictly.

This code is in charge of the administration of Ministry of Construction of the People's Republic of China and the obligatory items are under the explanation of it.China Electric Power Research Institute is responsible for the explanation of specific technical contains.

During the implementation of this code,the interests concerned are requested to summarize experience from actual practices and refer any comments and suggestions on modification or supplementation to China Electric Power Research Institute at the address of No.33.South Binhe Road.Xicheng District.Beijing.Postcode 100055.

Chief Development Organization,Participating Development Organizations and Chief Drafting Staff are:

Chief Development Organization:

China Electric Power Research Institute

Participating Development Organizations:

Wuhan High Pressure Institute

Gansu Electric Power Engineering Co.

Northeast Electric Management Bureau No.2 Engineering Co.

Jiangsu Electric Power Construction No.1 Company

Jilin Electric Power Construction Head Company

Beijing Electric Power Co.

Beijing Electric Power Engineering Co.

Dalian Electric Supply Bureau

Xi'an Electric Supply Bureau

Lanzhou Electric Supply Co.

Chief Drafting Staff:

Chen Fayu Yang Rongkai Xue Ying Sun Guanfu Wang Qiang Chen Guiying

Li Shiyi Zhou Zuochun Liao Hongmei Jing Xiaodong Su Shaogang

主站蜘蛛池模板: 浮梁县| 新兴县| 淮阳县| 徐闻县| 丰城市| 忻州市| 盘锦市| 澜沧| 阿拉尔市| 海晏县| 恭城| 巴中市| 古丈县| 嘉荫县| 白沙| 雷州市| 麦盖提县| 定远县| 巴里| 海林市| 靖远县| 黑山县| 榕江县| 阿勒泰市| 惠东县| 留坝县| 红桥区| 慈溪市| 西充县| 兴海县| 元朗区| 普陀区| 左贡县| 仁布县| 格尔木市| 会宁县| 邢台县| 高碑店市| 吉木乃县| 宁远县| 遂宁市|