- GB50149-2010電氣裝置安裝工程母線裝置施工及驗收規范(英文版)
- 中華人民共和國住房和城鄉建設部
- 266字
- 2020-09-25 15:29:22
Foreword
This code is revised by China Electric Power Research Institute and Jiangsu Electric Power First Engineering Company on the basis of GBJ 149-90 Electric Equipment Installation Engineering Code for Construction and Acceptance of Busbar Equipments and in accordance with Notice on Project Construction Standard Preparation and Revision Plan of 2006(Second Batch)(Jian Biao[2006]No.136)issued by the Ministry of Construction.
This code is divided into 5 chapters:
1 General Provisions
2 Terminology
3 Busbar Installation
4 Installation of Insulator and Wall Bushing
5 Project Handover and Acceptance
The provision(s)printed in bold type are compulsory ones and must be enforced strictly.
Ministry of Housing and Urban-Rural Development of The People's Republic China is in charge of The administration of this code and the explanation of the compulsory provision,China Electricity Council is in charge of routine management of this code,China Electric Power Research Institute is responsible for the explanation of specific technical contents.
The chief development organization,participating development organizations,chief drafting staff and chief reviewers are:
Chief Development Organization:
China Electric Power Research Institute
Participating Development Organizations:
Jiangsu Electric Power First Engineering Company
Sichuan Electric Power Third Engineering Company
Beijing Electric Power Engineering Company
Beijing Power Transmission and Conversion Company
Shanghai Electric Power Engineering Company
Chief Drafting Staff:
Liu Aimin Li Zhenqiang Wang Qiang Zhang Lie Jing Jin Zou Yunbo
Li Jie Lu Yonghua
Chief Reviewers:
Chen Fayu Cai Xinhua Sun Yong Li Bo Gan Huanchun Liu Changgen
Ge Zhanyu Ma Quansheng Zhu Yongzhi Wang Yimin Mei Xiufeng
- GB 51245-2017 工業建筑節能設計統一標準
- GB 50227-2017 并聯電容器裝置設計規范
- GB 51185-2016 煤炭工業礦井抗震設計規范
- GB/T 50943-2015 海岸軟土地基堤壩工程技術規范
- GB 50349-2015 氣田集輸設計規范
- GB 51179-2016 煤礦井下煤炭運輸設計規范
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB/T50609-2010石油化工工廠信息系統設計規范(英文版)
- GB 50469-2016 橡膠工廠環境保護設計規范
- DL/T5161.9-2002電氣裝置安裝工程質量檢驗及評定規程第9部分:蓄電池施工質量檢驗(英文版)
- GB 51184-2016 礦山提升井塔設計規范
- GB 51284-2018 煙氣脫硫工藝設計規范
- GB50468-2008焊管工藝設計規范(英文版)
- GB/T50063-2008電力裝置的電測量儀表裝置設計規范(英文版)
- 工控技術應用數學(修訂版)