6.2 Cutting
Ⅰ Dominant Items
6.2.1 In the cut surface or shear surface of steel material,there shan't be any crack,slag inclusion,stratification,or wane more than 1mm.
Quantity for inspection:one hundred percent;
Inspection method:examine with eyes or hand lens or dial gauge;and when the inspection result is in doubt,detect via permeation flaw detection or magnetic particle inspection or ultrasonic flaw detection.if in doubt.
Ⅱ General Items
6.2.2 The allowable variations of cutting shall be in conformity with the requirements listed in the Table 6.2.2.
Quantity for inspection:inspect randomly 10% of the total of cut surfaces,but not less than 10;Inspection method:examine with steel rulers or clearance gauges.
Table 6.2.2 Allowable variations for cutting(mm)

Note:t is the thickness of cutting face;d is the diameter of round steel.
- 產(chǎn)品首版制作
- GB50551-2010球團(tuán)機(jī)械設(shè)備安裝工程質(zhì)量驗(yàn)收規(guī)范(英文版)
- GB 50077-2017 鋼筋混凝土筒倉(cāng)設(shè)計(jì)標(biāo)準(zhǔn)
- GB/T51167-2016海底光纜工程驗(yàn)收規(guī)范(英文版)
- DL/T 5491-2014 電力工程交流不間斷電源系統(tǒng)設(shè)計(jì)技術(shù)規(guī)程
- GB 51185-2016 煤炭工業(yè)礦井抗震設(shè)計(jì)規(guī)范
- DL/T5161.1-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第1部分:通則(英文版)
- DL/T5161.3-2002電氣裝置安裝工程質(zhì)量檢驗(yàn)及評(píng)定規(guī)程第3部分:電力變壓器、油浸電抗器、互感器施工質(zhì)量檢驗(yàn)(英文版)
- GB50377-2006選礦機(jī)械設(shè)備工程安裝驗(yàn)收規(guī)范(英文版)
- GB/T 50491-2018 鐵礦球團(tuán)工程設(shè)計(jì)標(biāo)準(zhǔn)
- GB50148-2010電氣裝置安裝工程電力變壓器、油浸電抗器、互感器施工及驗(yàn)收規(guī)范(英文版)
- 核電站鋼板混凝土結(jié)構(gòu)技術(shù)標(biāo)準(zhǔn)
- GB 51214-2017 煤炭工業(yè)露天礦邊坡工程監(jiān)測(cè)規(guī)范
- 換流站接地極設(shè)計(jì)文件內(nèi)容深度規(guī)定
- 汽車故障診斷技巧與禁忌速查手冊(cè)