3.4 Packer
Ⅰ Main Control Item
3.4.1 The padding or grouting cement 48 hour strength shall meet the foundation cement design strength during the padding or grouting method for packer construction.
Inspection quantity:lot by lot inspection.
Inspection method:check padding or grouting sampling block test report.
Ⅱ General Item
3.4.2 Packer setting shall meet the requirements of design documents.If there is no requirement from the design,it shall meet the requirements of current national standard,i.e.,General code for construction and acceptance of mechanical equipment installation engineering GB 50231.
Inspection quantity:20% sampling inspection and not less than 4 pieces.
Inspection method:observe,measure with ruler,check with feeler gauge and rap the packer.
3.4.3 When adapt the grinding method for packer construction,chip the concrete foundation surface to smooth level and the contact points of concrete surface and packer shall be evenly distributed.
Inspection quantity:20% sampling inspection and not less than 4 pieces.
Inspection method:pigmentation inspection.
- DL/T 5526-2017 換流站噪聲控制設計規程
- GB 51139-2015 纖維素纖維用漿粕工廠設計規范
- GB 51287-2018 煤炭工業露天礦土地復墾工程設計標準
- 配用電通信技術及產業發展報告
- GB 50428-2015 油田采出水處理設計規范
- 加油站在役油罐防滲漏改造工程技術標準
- GB 51179-2016 煤礦井下煤炭運輸設計規范
- GB/T 51331-2018 煤焦化焦油加工工程設計標準
- 建標 152-2017 城市消防站建設標準
- 核電站鋼板混凝土結構技術標準
- GB50060-20083~110kV高壓配電裝置設計規范(英文版)
- GB50629-2010板帶軋鋼工藝設計規范(英文版)
- GB/T 50938-2013 石油化工鋼制低溫儲罐技術規范(英文版)
- GB50439-2015煉鋼工程設計規范(英文版)
- GB50402-2007燒結機械設備工程安裝驗收規范(英文版)