4.2 Technical Index of Blast Furnace Production
4.2.1 The blast furnace's annual average productivity,fuel ratio and coke ratio should be consistent with the requirements stated in Table 4.2.1.
Table 4.2.1 Designed Annual Average Productivity,Fuel Ratio and Coke Ratio of Blast Furnace

Notes:1 The above table excludes the designed indicators for special ore smelting.
2 The fuel ratio in the above table is valued for coke,coal powder and nut coke,but not considering reduction factor.
3 The coke ratio in the above table is valued including nut coke.
4.2.2 The annual operation rate of blast furnace should be designed as 97%.
The designed annual output of blast furnace shall be calculated with the following formula:
designed annual output of blast furnace(t)=effective volume(m3)×designed annual average productivity[t/(m3·d)]×designed annual operation rate×annual calendar days(d)…(Item 4.2.2)
4.2.3 The maximal capacity of blast furnace equipment shall be designed on the basis of normally designed annual average productivity and foreseen with the capacity of additional 0.1t/(m3.d)-0.2t/(m3·d).The equipment capacity for blast furnace in volume of no less than(≥)2000m3 should be no larger than(≤)2.5t/(m3·d).
4.2.4 The energy consumption,general heat value of energy and reduction factor of standard coal of ironmaking procedure shall be calculated in compliance with the relevant stipulations as stated in Code for Design of Energy Saving of Iron and Steel Industry(GB 50632).The calculation result of unit consumption of ironmaking procedure shall be consistent with the requirements stated in Table 4.2.4.
Table 4.2.4 Energy Consumption per ton Hot Metal

Notes:1 The above table excludes the designed indicators for special ore smelting.
2 The power reduction factor for the above table takes 0.1229kgce/(kW·h).
- 輸變電工程經濟評價導則
- 電站汽輪發電機組輔機換熱設備選型設計規程
- GB50764-2012電廠動力管道設計規范(英文版)
- GB/T 51243-2017 物聯網應用支撐平臺工程技術標準
- 鄭州軌道交通機電設備運營需求標準
- GB/T 51200-2016 高壓直流換流站設計規范
- DL/T 5516-2016 火力發電廠集中控制室及電子設備間布置設計規程
- 工程建設標準體系(農業工程部分)
- 工程師形成的質量規制研究
- DL/T5161.12-2002電氣裝置安裝工程質量檢驗及評定規程第12部分:低壓電器施工質量檢驗(英文版)
- 中國磁光電混合存儲產業藍皮書
- GB/T 51280-2018 工程泥沙設計標準
- DL/T5235-2010±800kV及以下直流架空輸電線路工程施工及驗收規范(英文版)
- 數據中心基礎設施運行維護標準
- 柔性直流輸電成套設計標準