3.2 Main Electrical Connection
3.2.1 The main electrical connection of a substation shall be determined based on the role of the substation in the grid,the number of outgoings,equipment features and load characteristics,and shall ensure reliable power supply,flexible operation,easy operating and repairing,low cost and convenient extension.
The voltage levels should be reduced and the connection be simplified provided that the power supply plan can be satisfied.
3.2.2 A minimum number of circuit breakers or even no circuit breaker shall be used on the high voltage side of a substation provided that the operational requirements can be met.
3.2.3 For 35kV-110kV lines,bridge connection,enlarged bridge connection,line-transformer unit connection or T-shape connection,single busbar or sectionalized single busbar connection should be used.
3.2.4 Where there are eight or more 35kV-66kV outgoings,double busbar connection should be used.If there are six or more 110kV outgoings,double busbar connection should be used.
3.2.5 Where there are two or more main transformers in a substation,sectionalized single busbar connection should be used for 6kV-10kV lines.The busbar shall be sectionalized in a way to facilitate load distribution among the remaining main transformers when one main transformer is out of service.
3.2.6 Where it is necessary to limit the short-circuit current of the 6kV-10kV lines,one of the following measures may be taken:
1 Separate operation of transformers;
2 High-impedance transformers;
3 Series current-limiting devices in the transformer loop.
3.2.7 The lightning arrester and potential transformer connected to a busbar may share one set of disconnector.The lightning arrester connected to transformer should not be equipped with disconnector.
- GB 50309-2017 工業(yè)爐砌筑工程質(zhì)量驗收標準
- 電站汽輪發(fā)電機組輔機換熱設(shè)備選型設(shè)計規(guī)程
- 電磁式流量傳感器測量方法及理論
- 強夯地基技術(shù)規(guī)程
- DL/T5161.7-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第7部分:旋轉(zhuǎn)電機施工質(zhì)量檢驗(英文版)
- 水泥工廠環(huán)境保護設(shè)施設(shè)計標準
- GB50402-2007燒結(jié)機械設(shè)備工程安裝驗收規(guī)范(英文版)
- GB 51303-2018 船廠工業(yè)地坪設(shè)計標準
- GB/T 50459-2017 油氣輸送管道跨越工程設(shè)計標準
- GB 51170-2016 航空工業(yè)工程設(shè)計規(guī)范
- GB/T 50312-2016 綜合布線系統(tǒng)工程驗收規(guī)范
- DL/T 5493-2014 電力工程基樁檢測技術(shù)規(guī)程
- 核電廠混凝土結(jié)構(gòu)技術(shù)標準
- GB 50390-2017 焦化機械設(shè)備安裝驗收規(guī)范
- 金屬露天礦工程施工及驗收標準