5.4 Distributing,Ignition and Sintering
5.4.1 The segregated distributing shall be adopted for large and medium scale straight line sinter machines.
5.4.2 The sinter machine shall be large sized and its specification shall match with the blast furnace.
5.4.3 One large sized sinter machine and no more than two medium or small sized sinter machines shall be set up in the sintering and cooling room.
5.4.4 The hearth layer facilities shall be set up for the sinter machine.The storage time of hearth-layer material should be 1-2h,and the depth of hearth layer material on the pallet of sinter machine should be 20-40mm.
5.4.5 Deep-bed sintering process shall be adopted for large-scale and medium-scale sinter machines.The bed depth(including hearth layer depth)should be greater than or equal to 600mm when iron ore concentrates are major raw materials.The bed depth should be greater than or equal to 700mm when iron ore fines are the major raw materials.
5.4.6 Unpowered hot air supply mode should be adopted when hot air sintering is adopted.
5.4.7 When siderite or limonite sintering is adopted,a drying zone for preheating mixture should be set up before ignition.
5.4.8 Ignition temperature of mixture should be 1050℃-1200℃,but the ignition temperature of special raw materials shall be determined according to the test results.Ignition time should be 1-1.5min.Various kinds of gases which are mentioned in item 3 in 4.1.3 of this specification should be adopted as ignition fuels for large-scale and medium-scale sinter machines.Coal fines and heavy oil should not be used for ignition.When coke oven gas and natural gas are adopted as ignition fuels,the specific consumption of gas should be smaller than or equal to 0.065GJ/t-s.When convertor gas is used as ignition fuels,the specific consumption of gas should be smaller than or equal to 0.08GJ/t-s.When BF gas is used as ignition fuel,the specific consumption of gas should be smaller than or equal to 0.16GJ/t-s,and the ignition and afterheating furnace with coal gas and air preheating should be adopted.
5.4.9 The size of sinter cake after crushing shall be smaller than or equal to 150mm.
5.4.10 Hot sinter screen should be cancelled for the sintering process.
5.4.11 When there are hot sinter return fines,they should be directly proportioned at the discharge end of sinter machine,and the hot sinter screen shall be deviated from bin center.
- DL/T 5491-2014 電力工程交流不間斷電源系統設計技術規程
- GB50588-2017水泥工廠余熱發電設計標準(英文版)
- 真空電子器件生產線設備安裝技術標準
- GB/T 50938-2013 石油化工鋼制低溫儲罐技術規范(英文版)
- 標準貫入試驗規程
- 建設工程化學灌漿材料應用技術標準
- GB/T 50312-2016 綜合布線系統工程驗收規范
- DL/T 5153-2014 火力發電廠廠用電設計技術規程
- 核電廠建構筑物維護及可靠性鑒定標準
- GB/T 50451-2017 煤礦井下排水泵站及排水管路設計規范
- GB 51219-2017 禽類屠宰與分割車間設計規范
- GB/T 51259-2017 腈綸設備工程安裝與質量驗收規范
- 電子工業廠房綜合自動化工程技術標準
- YS/T 5430-2016 有色金屬工業建筑工程質量檢驗評定統一標準
- GB 51206-2016 太陽能電池生產設備安裝工程施工及質量驗收規范