3.6 Analysis
3.6.1 The sampling component of analysis instrument shall be installed at the representative position of sample according to the requirements of the design and manufacturer's product technical document.
3.6.2 The analysis instrument of flue gas,desulfurization and denitration system shall be installed in accordance with the requirements of the manufacturer's product technical document.
3.6.3 The installation position of the zirconia probe shall be kept clear from the air leakage place and shall have the slope to let the condensed water flow back to the flue.When measuring,the temperature of gas sample shall meet the requirements of the manufacturer's product technical document.
3.6.4 The sampling system of hydrogen analyzer shall take the hydrogen gas from position with higher hydrogen pressure,and the hydrogen gas shall enter into the position with lower hydrogen pressure by passing through analyzer,the gas pipeline system shall be tight.
- GB 51139-2015 纖維素纖維用漿粕工廠設計規范
- GB50460-2015 油氣輸送管道跨越工程施工規范
- 中文版Rhino 5.0完全自學教程(培訓教材版)
- 焊接技能實訓
- GB 50243-2016 通風與空調工程施工質量驗收規范
- GB/T 51331-2018 煤焦化焦油加工工程設計標準
- 微波集成組件生產工廠工藝設計標準
- GB/T 51266-2017 機械工廠年時基數設計標準
- GB/T 51175-2016 煉油裝置火焰加熱爐工程技術規范
- GB/T 50761-2018 石油化工鋼制設備抗震設計標準
- GB/T 50938-2013 石油化工鋼制低溫儲罐技術規范(英文版)
- SH/T3143-2012石油化工往復壓縮機工程技術規范(英文版)
- GB 51205-2016 精對苯二甲酸工廠設計規范
- DL/T5161.12-2002電氣裝置安裝工程質量檢驗及評定規程第12部分:低壓電器施工質量檢驗(英文版)
- GB50474-2008隔熱耐磨襯里技術規范(英文版)