4.2 Equipment Foundation
4.2.1 Before the installation of equipment,foundation acceptance inspection shall be made,and only after the foundation is qualified can equipment be installed.
4.2.2 The appearance of equipment foundation shall be inspected and oil dirt,water and other contaminations on its surface and in the holes reserved for anchor bolts shall be removed thoroughly;threads and nuts of buried anchor bolts shall be kept in good condition.
4.2.3 Actual measurement inspection shall be carried out for equipment foundation and the center line,elevation,dimension,locations of anchor bolts and reserved openings shall be in accordance with requirements of the design documents and the stipulations of current national standard GB 50204 Code for Construction Quality Acceptance of Concrete Structure Engineering.
4.2.4 There shall be measuring data for foundation and the data shall be handed over.
4.2.5 The layout drawing for center line and elevation benchmark shall be made,and the central standard plate and elevation benchmark shall be set up.The permanent central standard plate and elevation benchmark shall be embedded for the main equipment and continuous production equipment.
- 鋼鐵企業(yè)原料場工程設計標準
- YS/T 5225-2016土工試驗規(guī)程
- 海上風力發(fā)電場勘測標準
- DL/T 5492-2014電力工程遙感調(diào)查技術規(guī)程
- 電力調(diào)度數(shù)據(jù)網(wǎng)絡工程設計規(guī)程
- DL/T 5491-2014 電力工程交流不間斷電源系統(tǒng)設計技術規(guī)程
- GB 50349-2015 氣田集輸設計規(guī)范
- DL/T5161.6-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第6部分:接地裝置施工質(zhì)量檢驗(英文版)
- DL/T5161.7-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第7部分:旋轉(zhuǎn)電機施工質(zhì)量檢驗(英文版)
- GB/T 51266-2017 機械工廠年時基數(shù)設計標準
- GB 51203-2016 高聳結(jié)構(gòu)工程施工質(zhì)量驗收規(guī)范
- 《電氣裝置安裝工程 低壓電器施工及驗收規(guī)范》實施指南
- 工業(yè)文化研究(第2輯):紀念改革開放四十年——中國工業(yè)的大轉(zhuǎn)型
- DL/T5161.4-2002電氣裝置安裝工程質(zhì)量檢驗及評定規(guī)程第4部分:母線裝置施工質(zhì)量檢驗(英文版)
- GB 50404-2017 硬泡聚氨酯保溫防水工程技術規(guī)范