9.2 Head Pulley
Ⅰ Major Items
9.2.1 Assembly of sprockets of head pulley shall meet the requirements of design technical documents.
Quantity checked:All.
Checking method:Check by observation and field tests.Check assembly records.
9.2.2 The spacing of bearing pedestals of head pulleys and axial playing gaps of bearings shall meet the requirements of design technical documents.Head pulley shall be fixed by welding with baffles on both sides of the bearing pedestal after alignment.
Quantity checked:All.
Checking method:Check installation quality records.Check by observation.
Ⅱ General Items
9.2.3 Bearing pedestal and bearing base,bearing base and traveling grate equipment support shall tightly contact after fastening of bolts.The crammed area shall not exceed 1/3 contact area checked by clearance gauge of 0.05mm.
Quantity checked:All.
Checking method:Check by observation and clearance gauge.
9.2.4 Allowable deviation of head pulley installation shall be in accordance with those specified in Table 9.2.4.Refer to Figure 9.2.4.
Quantity checked:All.
Checking method:Refer to Table 9.2.4.
Table 9.2.4 Allowable deviation of head pulley installation(mm)


Figure 9.2.4 Head pulley of traveling grate equipment
1-Head pulley;2-Bearing pedestal;3-Longitudinal center line of traveling grate equipment
- GB51005-2014水泥工廠余熱發電工程施工與質量驗收規范(英文版)
- GB/T51075-2015選礦機械設備工程安裝規范(英文版)
- GB50169-2006電氣裝置安裝工程接地裝置施工及驗收規范(英文版)
- 電磁式流量傳感器測量方法及理論
- GB/T 51331-2018 煤焦化焦油加工工程設計標準
- DL/T 5221-2016 城市電力電纜線路設計技術規定
- GB/T 51175-2016 煉油裝置火焰加熱爐工程技術規范
- GB 50360-2016 水煤漿工程設計規范
- 發光二極管生產工藝設備安裝工程施工及質量驗收標準
- DL/T5161.12-2002電氣裝置安裝工程質量檢驗及評定規程第12部分:低壓電器施工質量檢驗(英文版)
- GB/T 51169-2016 煤炭工業礦井采掘設備配備標準
- 火力發電企業繼電保護技術監督手冊
- GB/T 50063-2017 電力裝置電測量儀表裝置設計規范
- GB50930-2013冷軋帶鋼工廠設計規范(英文版)
- GB/T 51126-2015 波分復用(WDM)光纖傳輸系統工程驗收規范(英文版)