6.3 Jacketed Piping Fabrication
6.3.1 Adjusting spools shall be reserved for jacketed piping,and adjusting allowance should be within 50mm-100mm.
Method:measurements checking.
6.3.2 100% of radiographic test shall be performed for concealed butt welds of inner pipe of jacketed piping.Acceptance criteria shall meet the requirements for corresponding piping class specified in Article 9.3.1 of this code.
Method:check radiographic test reports.
6.3.3 Spacers between inner pipe and outer pipe of jacketed piping shall be erected according to the design documents.Gap shall be uniform and coaxiality shall be 3mm.
Method:visual examination and measurements checking.
6.3.4 Pressure test shall be performed according to Chapter 10 of this code after inner pipes and spacers of jacketed piping are fabricated and welded,and all welds are NDE tested and accepted.All welds of inner pipes shall be exposed during pressure test.
Method:in-process examination.
- GB50168-2006電氣裝置安裝工程電纜線路施工及驗收規范(英文版)
- GB 51145-2015 煤礦電氣設備安裝工程施工與驗收規范
- GB50172-2012電氣裝置安裝工程蓄電池施工及驗收規范(英文版)
- 電動汽車工程手冊(第六卷):智能網聯
- GB 51138-2015 尿素造粒塔工程施工及質量驗收規范
- SH3011-2011石油化工工藝裝置布置設計規范(英文版)
- GB50377-2006選礦機械設備工程安裝驗收規范(英文版)
- GB 50084-2017 自動噴水滅火系統設計規范
- GB50764-2012電廠動力管道設計規范(英文版)
- GB 51333-2018 厚膜陶瓷基板生產工廠設計標準
- GB/T 50938-2013 石油化工鋼制低溫儲罐技術規范(英文版)
- SH/T3143-2012石油化工往復壓縮機工程技術規范(英文版)
- 平板玻璃工廠節能設計標準
- 海上架空輸電線路設計技術規程
- DL/T 5543-2018 特高壓輸變電工程環境影響評價內容深度規定